BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20181004T153000Z
DTEND:20181004T170000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Bridge Workshop
DESCRIPTION:ACEC/NC & NCDOT Bridge Workshop\n\n(Please note the new location for this event)\n\n\n\nWorth 1 PDH Credit\n\n \n\nTopic: \n\nHerbert C. Bonner Bridge Construction\n\nPresenters:\nDomenic Coletti\, PE\, HDR\n\nNick Amico\, PE\, HDR\n\n\n\n\n\n\nProject Overview and Purpose\n\nThe Herbert C. Bonner Bridge\, which carries N.C. 12 over Oregon Inlet between Hatteras and Bodie islands\, is well past its design life and is being replaced with a new bridge that will better withstand its coastal environment.\n\nThrough the use of high-durability concrete\, stainless reinforcing steel and other engineering features\, the new bridge is designed to have a 100-year life span and will provide more options for navigation under the bridge.\n\n\n\nDesign aspects of this Design-Build project to be discussed include precast bridge elements\, large precast pile installation and segmental box girder design\, all in a marine environment.
X-ALT-DESC;FMTTYPE=text/html:ACEC/NC &\; \;NCDOT Bridge Workshop
\n(Please note the new location for this event)
\n
\nWorth 1 PDH Credit
\n \;
\nTopic: \;
\nHerbert C. Bonner Bridge Construction
\nPresenters:\n